Waterworks Opus One Hole Bidet Fitting with Egg Handles Uživatelský manuál

Procházejte online nebo si stáhněte Uživatelský manuál pro Příslušenství pro vodu Waterworks Opus One Hole Bidet Fitting with Egg Handles. Waterworks Opus One Hole Bidet Fitting with Egg Handles User Manual Uživatelská příručka

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 1
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 0
Opus Single Hole Bidet Fitting With Egg Crystal Handle
11/02
WATE RWORK S
These guidelines have been prepared for the professional contractor to aid in the installation of:
OPUS SINGLE HOLE BIDET FITTING WITH EGG CRYSTAL HANDLE
(OPBF02-K)
All dimensions are based on original specifications and are subject to change and variation.
Please consult your Design Associate for current specifications.
Installation Guidelines
Figure 1
Escutcheon
Valve Stem Extension
Handle Trim Connector
Threaded Nipple
Rough Valve Body
Handle Fixing Cap
1
Figure 2
Stopper Assembly
Upper Collar
Upper Gasket
Lower Gasket
Lower Drain Body
Tailpiece Gasket
Tailpiece
Pivot Rod
Knurled Nut
NOTES
Use only a protected, smooth-jawed, or strap wrench on any finished surface.
A low-level bidet trap (JUBF 94) for wall rough-in is available.
INSTALLING HOT AND COLD CONTROL VALVES: (see fig.1)
ROUGH-IN:
Install valve by using
3
4
"M by
1
2
"C reducing adapter.
Install both valves in the wall at the recommended depths. Ensure the valves are installed
with the water flowing in the direction indicated.The valves should be installed at a
height and spread comfortable to the user (e.g. 8” O.C. and 28” from finished floor).
Separate service stops downstream will facilitate the servicing of the control valves.
Pipe the control valves to
3
8" IPS finished piped nipples with flange and
compression adapter (not included).
FINISH:
Screw on the handle trim and connector together.Then thread the trim
assembly onto the valve until fully seated.
Measure from the base of the escutcheon to the wall. Remove the trim
assembly and retain this measurement.
Cut the valve stem and threaded sleeve so that the trim becomes flush with
the wall.The amount cut from the valve stem and threaded sleeve should
be the same as the distance measured in the previous step.
Slide the valve stem extension and handle fixing cap over the valve stem.Thread the
handle trim assembly onto the threaded sleeve. Push handle to lock onto the fixing cap.
Check to ensure the escutcheon is flush with the finished wall. If necessary,
cut the valve stem and threaded sleeve further to make flush.
INSTALLING THE BIDET SPOUT:
Unscrew the locking barrel nuts at the base of the fitting to release the
mounting plate and gasket.Then insert the fitting through the mounting hole
and secure by re-attaching and tightening the barrel nuts.
Connect the
3
8" supply tubes to the hot and cold water supplies.
INSTALLING THE POP-UP DRAIN: (see fig.2)
Remove the upper collar from the pop-up drain assembly and discard the upper gasket.
Set the upper collar in the drain opening using a clear adhesive silicone.
Re-attach the lower drain assembly using the gasket provided.Tighten until fully
secured and the side connection is facing the wall. A clear adhesive silicone may
be used to ensure a water-tight seal between the gasket and the bidet fixture.
Remove the knurled nut from the side connection of lower drain assembly.
Then insert the horizontal pivot rod and re-attach the knurled nut.
Insert the vertical lift rod through the bidet body and connect to the pivot
rod, using the linkage provided (if necessary, the rods may be field cut).
To adjust the height of the drain stopper turn the adjustment screw at the
base of the stopper and tighten the locking nut upward to secure.
Attach the flanged tailpiece to the lower drain assembly using the gasket
provided.Then connect the tailpiece to the drain line.
Check all connections for leaks.
After installation, unscrew and remove the aerator assembly. Carefully open the
hot and cold valves fully to flush out any debris in the supply lines. Once the
lines have been flushed , close the valves and reinstall the aerator assembly.
If further assistance is required, please contact Product Support at:
1-800-927-2120 (8AM-7PM EST)
2
3
8"
1
3
4"
max.
12" max.
1
3
8"
ø2
5
16"
3
8" O.D.
compression
x 12" long
2
3
8"
2
3
4" min.
4
1
2" max.
3
1
8"
2
3
8"
3
3
16"
2"
3
4" Female NPT
OPBF02-K
Zobrazit stránku 0
1

Shrnutí obsahu

Strany 1 - Installation Guidelines

Opus Single Hole Bidet Fitting With Egg Crystal Handle11/02WATE RWORK SThese guidelines have been prepared for the professional contractor to aid in

Komentáře k této Příručce

Žádné komentáře