Waterworks .25 Wall Mounted Tub Spout Uživatelský manuál

Procházejte online nebo si stáhněte Uživatelský manuál pro Příslušenství pro vodu Waterworks .25 Wall Mounted Tub Spout. Waterworks .25 Wall Mounted Tub Spout User Manual Uživatelská příručka

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 2
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 0
2
5
8
9
1
8
"
Installation Guidelines
W A T E R W O R K S
Waterworks is a registered trademark of Waterworks Inc.
04.11.07
.25 Wall Mounted Tub Spout
PTTU82
These guidelines have been prepared for the professional contractor to aid in the installation of:
.25 WALL MOUNTED TUB SPOUT (PTTU82) All dimensions are based on origin specification
and are subject to change and variation. Please consult your Design Associate for current specifications.
6. The face of the adapter (1) requires being 1
1
4
" from
the finished wall, see figure 1.
7. After verifying fit, make sure the mark made in step 4
remains at 12:00 then sweat the spout adapter (1)
onto the copper. If it is not aligned, the spout will not
thread on completely and cause a leak or not align
properly so the tip points down at 6:00.
8. Allow the adapter to cool then slide the escutcheon
(3) onto the adapter.
9. Thread the spout onto the adapter making sure the
washer (4) is in place.
10. Remove aerator using tool provided.
11. Turn on the supplies to check leaks and verify
proper function.
12. Reinstall aerator.
If further assistance is required, please contact
Product Support at 1-800-927-2120 (8am-7pm EST).
IMPORTANT
To ensure this product is installed properly, you must
read and follow these guidelines.
The owner/user of this product must keep this
information for future reference.
Be sure your installation conforms to local codes.
This product must be installed by a professional
contractor.
Inspect this product to assure you have all parts
required for proper installation.
Use only a strap wrench or protected/smooth-jaw
wrench on any finished surface
INSTALLATION:
1. Install
3
4
" supplies for optimum flow and stub-out a
section of
3
4
" copper.
2. After the finished wall is complete, cut the copper so
it protrudes
3
4
" from the surface of the finished wall.
3. Unpack the spout and verify the spout adapter (1) is
threaded completely into the spout.
4. To verify alignment of the spout and adapter, make a
mark at 12:00 that extends from the spout onto the
adapter.
5. Unthread the adapter from the spout then slide the
adapter onto the copper.
8
1
8
"
FIGURE 1
Finished Wall
1
1
1
4
"
3
4
"Ø Copper
Zobrazit stránku 0
1 2

Shrnutí obsahu

Strany 1 - Installation Guidelines

258"Ø918"Installation GuidelinesW A T E R W O R K SWaterworks is a registered trademark of Waterworks Inc.04.11.07.25 Wall Mounted

Strany 2

Installation GuidelinesW A T E R W O R K SWaterworks is a registered trademark of Waterworks Inc..25 Wall Mounted Tub SpoutPARTS TABLEITEM NO

Komentáře k této Příručce

Žádné komentáře